Flow Meter Installation in Constrained Spaces

Optimize Process for Magnetic Flow Meters with Limited Upstream and Downstream Straight Runs
Improve Flexibility with Expanded Specifications

Improve Flexibility with Expanded Specifications

The industry standard for magnetic flow meter installations is to install it with five upstream pipe diameters and two downstream pipe diameters. This allows the conductive incompressible fluid to have a more symmetric flow profile and more accurate flow rate readings. However, sometimes the recommended straight run is not available for an application. In this case, an accurate and repeatable measurement is still desired. Rosemount™ 8700 sensors can provide accurate and repeatable measurements without any upstream or downstream straight run. This enables an accurate flow measurement anywhere in the plant without specifying unique features to do so.

Read More...
Click to continue reading Improve Flexibility with Expanded Specifications
Please enable JavaScript to use this website.